Buscar

Estamos realizando la búsqueda. Por favor, espere...

Detalle_Publicacion

Temporary Cable Force MonitoringTechniques during Bridge Construction-Phase: The Tajo River Viaduct Experience

Abstract: This article deals with the comparative analysis of current cable force monitoring techniques. In addition, the experience of three cable stress monitoring techniques during the construction phase is included: (a) the installation of load cells on the active anchorages of the cables, (b) the installation of unidirectional strain gauges, and (c) the evaluation of stresses in cables applying the vibrating wire technique by means of the installation of accelerometers. The main advantages and disadvantages of each technique analysed are highlighted in the Construction Process context of the Tajo Viaduct, one of the most singular viaducts recently built in Spain

Otras publicaciones de la misma revista o congreso con autores/as de la Universidad de Cantabria

 Fuente: Scientific Reports, 2022, 12(1), 7689

Editorial: Nature Publishing Group

 Fecha de publicación: 01/12/2022

Nº de páginas: 17

Tipo de publicación: Artículo de Revista

 DOI: 10.1038/s41598-022-11746-z

ISSN: 2045-2322

 Proyecto europeo: info:eu-repo/grantAgreement/EC/H2020/769373/EU/Future proofing strategies FOr RESilient transport networks against Extreme Events/FORESEE/

Url de la publicación: https://doi.org/10.1038/s41598-022-11746-z

Autoría

ALVARO GAUTE ALONSO

DAVID GARCIA SANCHEZ

IÑIGO CALDERON URISZAR-ALDACA