A proposed methodology for prioritizing project effects to include in cost-benefit analysis using resilience, vulnerability and risk perception

Abstract: Cost-benefit analysis (CBA) has emerged as one of the most widely used methodologies in environmental policy analysis, with many governments applying it in their decision-making procedures and laws. However, undertaking a full CBA is expensive, and conclusions must be drawn on which project or policy impacts to include in the analysis. Based on the ideas of resilience, vulnerability and risk, we suggest a method for prioritizing project impacts for inclusion in a CBA, which includes both expert assessment and citizen preferences. We then illustrate how the method can be applied in the context of land use change decisions, using a real application.

Otras publicaciones de la misma revista o congreso con autores/as de la Universidad de Cantabria

 Autoría: Ortega S.T., Hanley N., Simal P.D.,

 Fuente: Sustainability (Switzerland), Volume 6, Issue 11, Pages 7945 - 7966

Editorial: MDPI

 Fecha de publicación: 01/11/2014

Nº de páginas: 22

Tipo de publicación: Artículo de Revista

 DOI: 10.3390/su6117945

ISSN: 2071-1050