Estamos realizando la búsqueda. Por favor, espere...
1549
37
172
26128
4138
2532
334
Abstract: In order to overcome the myopia problem, routing strategies must be based on formal representations of flow that automatically account for modifications in the values of parameters of interest and in the model itself. This work addresses this problem and discusses how to automatically incorporate resources (e.g. workstations/transportation devices/storage) in a Petri-net-derived model of flow that is modifiable at runtime to reflect and influence the routing in a manufacturing line. The modelling approach takes into consideration scalability needs and was experimentally validated. The applicability of the models is shown for PN-based dynamic scheduling.
Fuente: International Journal of Production Research, 2012, 50(2), 325-343
Editorial: Taylor and Francis
Año de publicación: 2012
Nº de páginas: 19
Tipo de publicación: Artículo de Revista
DOI: 10.1080/00207543.2011.561371
ISSN: 0020-7543,1366-588X
Url de la publicación: https://doi.org/10.1080/00207543.2011.561371
Leer publicación
POPESCU, CORINA
MARIA ANGELES CAVIA SOTO
JOSE LUIS MARTINEZ LASTRA
Volver